Section 01
Ferrocement High Rise Buildings
- Reduce cost by about 10% of R.C.C.
- Reduce time of construction by about 10% of R.C.C.
- Eliminates formwork of columns, beams, slabs
- Environment friendly
- Inbuilt structural formwork
- More durable, waterproof than R.C.C.
- Does not require major repairs in its lifetime
- Remains almost intact during earthquake and cyclone
- Can swing by a metre or so with no damage
- Resists fire for almost 48 hours at 750°C
- Has less self-weight by about 50% of R.C.C.
Section 02
Inbuilt Ferrocement Structural Formwork
- Thin section formwork for slabs, beams, columns
- Manufactured on machinery set-up
- Reinforcement of slabs, beams, columns incorporated in formwork body
- Additional reinforcement can be provided if required
- Formwork left permanently in the structure
- Time saving of about 10-15% and cost saving of about 10%
- Wiremesh in the formwork makes structures strong with negligible repair needs
- All inbuilt formwork for slabs, beams, columns is well connected and monolithic
- Best earthquake and cyclone resistant with least damages
- Structure shall not require repairs almost for life time
- Resists fire upto 750°C for 48 hours